Building the space 2013

In 2013 we made the decision to renovate the barn and start to use it as a workshop, gallery and creative space. We started in February and finished in July the same year. During this time we relaid the stone flag floor, rebuilt an internal dry stone wall (thanks to Steven at Fenchurch Stoneworks), we replaced all the windows and doors - including the huge 10 foot by 7 foot sliding door - the roof was insulated, two new mezzanine floors were built as well as two new staircases. It was an intense period of work and the finished space has since evolved to include a full pottery studio, a complete carpentry workshop and a huge log burning stove.